Skip to product information
Brand: Turnstone Cables
Connector Type: RJ45
Cable Type: Ethernet
Compatible Devices: Server
Special Feature: High Speed
- ✅ High-Speed Performance – Supports 10Gbps Ethernet up to 55 meters and 1Gbps up to 100 meters, with a 550MHz bandwidth for high-speed data transmission.
- ✅ 100% Pure Copper Conductors – Constructed with 23AWG solid bare copper, ensuring low resistance, better conductivity, and minimal signal loss over long distances.
- ✅ Shielded F/UTP Design – The aluminum foil shielding around the twisted pairs reduces electromagnetic interference (EMI) and crosstalk, delivering a stable and interference-free signal.
- ✅ Plenum (CMP) Fire-Retardant Jacket – Engineered with a low-smoke, flame-retardant jacket, meeting NFPA 262 and TIA/EIA safety standards, making it safe for HVAC ducts, ceilings, and air-handling spaces.
- ✅ Power Over Ethernet (PoE++) Ready – Fully supports PoE, PoE+, and PoE++ (4PPoE), making it perfect for IP cameras, VoIP phones, wireless access points, and other network-powered devices.
- ✅ 1000ft Bulk Spool for Easy Installation – Comes in an easy-pull reel/spool, allowing for tangle-free, smooth installation, perfect for large networking projects.
- ✅ Durable and Weather-Resistant – The shielded design provides extra durability and protection, making it ideal for noisy environments, industrial areas, and high-interference locations.
- ✅ Versatile Applications – Suitable for data centers, commercial buildings, hospitals, schools, and smart home installations, ensuring fast and secure connectivity for routers, switches, security systems, and Ethernet extenders.
Cat6 Plenum Shielded 1000ft 23AWG Solid Bare Copper Ethernet Cable Q699
Sale price
$49.50
Regular price $264.99
Shipping calculated at checkout.